Bridge Construction - Transport a 400 ton bridge element

NewZealand Berlin 2016-07-27

Views 9

Here transportet ALE Heavylift a 400 ton segment for the new Freybridge on a pontoon, of a river, to the remaining bridge structure.
this bridge part was welded together 1.5 kilometres upstream.
More on my Channel.

Share This Video


Download

  
Report form