In this video, lift a 400 ton bridge deck to the rest of existing bridge structure, With help from ALE Heavylift.
This bridge part was welded together 1.5 km upstream and then transport on a pontoon to the rest of existing bridge structure at the Heerstr.
More constructions videos will follow on my channel: http://www.dailymotion.com/newzealand-berlin