SEARCH
Fukushima reactor water leak risks delaying crisis plan
Al Jazeera English
2012-08-16
Views
10
Description
Share / Embed
Download This Video
Report
There are worrying developments at Japan's damaged Fukushima nuclear plant.
It is being reported that the fuel rod in Reactor Number One has melted.
This comes as the government confirmed a new leak of contaminated water from Reactor Number Three.
Show more
Share This Video
facebook
google
twitter
linkedin
email
Video Link
Embed Video
<iframe width="600" height="350" src="https://dailytv.net//embed/xsv5d0" frameborder="0" allowfullscreen></iframe>
Preview Player
Download
Report form
Reason
Your Email address
Submit
RELATED VIDEOS
01:01
Fukushima radiation leak: TEPCO admits contaminated water leaked from tank
01:01
Fukushima radiation leak: TEPCO admits contaminated water leaked from tank
01:22
TEPCO: 15 Meter Waves Hit Fukushima, Reactors Under As Much As 5 Meters Of Water
00:42
Tepco reports toxic water leak at crippled Fukushima...
01:08
Fukushima nuclear disaster: Tepco works to stop radioactive water leak into Pacific
01:03
Fukushima :Tepco admit contaminated water has leaked...
01:08
Fukushima nuclear disaster: Tepco works to stop radioactive water leak into Pacific
01:02
TEPCO cubrirá los reactores de Fukushima
00:29
Tepco confirma la fusión parcial del núcleo de otros dos reactores de Fukushima
01:27
TEPCO vídeo de primera personas en el interior del reactor Fukushima desde el desastre
00:45
TEPCO no descarta una fusión en el reactor 2 de Fukushima
01:23
Tepco releases second batch of treated water from Fukushima nuclear plant