SEARCH
LRT-1 Cavite Extension Phase 1 now 98.2% complete
PTVPhilippines
2024-06-07
Views
1
Description
Share / Embed
Download This Video
Report
LRT-1 Cavite Extension Phase 1 now 98.2% complete
Show more
Share This Video
facebook
google
twitter
linkedin
email
Video Link
Embed Video
<iframe width="600" height="350" src="https://dailytv.net//embed/x8zuwpa" frameborder="0" allowfullscreen></iframe>
Preview Player
Download
Report form
Reason
Your Email address
Submit
RELATED VIDEOS
00:54
LRMC: First phase ng LRT-1 Cavite Extension Project, malapit nang matapos
01:38
Operasyon ng LRT-1 Cavite Extension Phase One, pansamantalang suspendido ng tatlong weekends
00:34
LRMC: First phase ng LRT-1 Cavite Extension Project, malapit nang matapos
00:35
Test run sa 1st phase ng LRT-1 Cavite extension, naging matagumpay
00:32
LRT-1 Cavite extension 94% complete, on track for Q4 2024 opening
06:51
Konstruksyon ng LRT-1 Cavite extension, ininspeksyon ng DOTr; pinal na desisyon sa hinggil sa taas-pasahe sa LRT-1, posibleng ianunsyo sa unang bahagi ng 2023, ayon sa DOTr
02:33
Huling girder ng LRT-1 Cavite Extension, inilagay na; LRMC: LRT-1 Extension Project, target na matapos sa 2023 at magamit ng publiko sa 2024
02:47
#UlatBayan | Walo sa 120 na mga bagon ng LRT-1, dumating na sa Pilipinas; ilan sa mga bagong tren ng LRT-1, magagamit na sa Hulyo kung saan karamihan sa mga ito ay gagamitin sa LRT-1 Cavite Extension
02:19
Update sa konstruksyon ng LRT-1 Cavite extension project
01:01
DOTR, tiniyak na mananatiling abot-kaya ang pamasahe sa LRT-1 Cavite extension kapag nagbukas ito bago matapos ang 2024
02:46
Konstruksyon ng LRT-1 Cavite extension, sisimulan na
00:44
Kalahati ng konstruksyon ng LRT-1 Cavite Extension Project, tapos na