SEARCH
HS2 completes Bromford Tunnel portal at Washwood Heath
BirminghamWorld
2024-05-14
Views
310
Description
Share / Embed
Download This Video
Report
Work to build the 3.5 mile Bromford Tunnel bringing high speed trains into Birmingham has taken a leap forward as excavation of the 22 metre deep west portal is completed.
Show more
Share This Video
facebook
google
twitter
linkedin
email
Video Link
Embed Video
<iframe width="600" height="350" src="https://dailytv.net//embed/x8yh9fq" frameborder="0" allowfullscreen></iframe>
Preview Player
Download
Report form
Reason
Your Email address
Submit
RELATED VIDEOS
01:31
Birmingham Washwood Heath - Landor Street or The Track
00:57
HS2 landmark as giant tunnel boring machine completes work to Old Oak Common station
00:45
UK: Huge sinkhole opens up above a tunnel built for the HS2 high speed rail line
01:03
Huge tunnelling machine is digging underneath ancient woodland as the HS2 rail project goes full-speed ahead
03:42
Video shows a huge tunnelling machine called Dorothy digging underneath ancient woodland as the HS2 rail project goes full-speed ahead
00:45
Huge sinkhole opens up above a tunnel built for the HS2 high speed rail line leaving residents horrified
00:45
Residents horror as huge hole opens up above a tunnel built for the HS2 high speed rail line.
01:27
Birmingham Local Opposition To HS2!
01:11
Video from the scene in Washwood Heath Road, Ward End
03:05
Manchester reacts to Andy Burnham hitting out at future of HS2 rail project after concerns high speed rail travel to the North will be scrapped
07:16
Himachal Pradesh PM Modi Travels From South Portal Of 'Atal Tunnel' To North Portal Of The Tunnel
07:16
Himachal Pradesh PM Modi Travels From South Portal Of 'Atal Tunnel' To North Portal Of The Tunnel