SEARCH
Road was being built in place of the bridge being built at Sonasaanwari Railway Gate, the corporation stopped it.
Patrika
2024-02-04
Views
13
Description
Share / Embed
Download This Video
Report
Road was being built in place of the bridge being built at Sonasaanwari Railway Gate, the corporation stopped it.
Show more
Share This Video
facebook
google
twitter
linkedin
email
Video Link
Embed Video
<iframe width="600" height="350" src="https://dailytv.net//embed/x8s5a64" frameborder="0" allowfullscreen></iframe>
Preview Player
Download
Report form
Reason
Your Email address
Submit
RELATED VIDEOS
00:10
Road was being built in place of the bridge being built at Sonasaanwari Railway Gate, the corporation stopped it.
00:12
An iron net is being woven to erect the structure of the bridge being built at the railway gate.
00:12
Railway is getting the work of bridge construction done at Sonasaanwari Railway Gate.Railway is getting the work of bridge construction done at Sonasaanwari Railway Gate.
00:30
Long hall goods train stopped for two hours at Khimlasa Gate due to lack of signal
00:44
Fertilizer officer stopped wheat mixed with pebbles and soil, distribution being done at many shops
00:59
35 quintal is being spent, 12 rupees will be received from the corporation, if the amount is not increased, then the ultimatum to stop the purchase from Monday
00:56
Unclaimed bikes stopped the pace of development in railway station
00:25
Stadium in Railway Institute Ground, Retiring room to be built in Narmadapuram
00:18
New underpass with overbridge will be built in Khandwa railway section
00:32
railway gate
02:19
This railway gate closes 22 times
00:26
Khurai railway gate closed till March, remaining work of overbridge will be completed