Two men charged after damaging railway equipment, causing delays for Matildas fans

Views 3

For those that went to the World Cup game in Sydney, the loss was further soured by train delays after vandalism at a signal box caused a network shut down. Two men have been charged over damaging the transport infrastructure.

Share This Video


Download

  
Report form