SEARCH
Nairobi Expressway progress at South B area along Mombasa road
The Star Kenya
2021-01-06
Views
1
Description
Share / Embed
Download This Video
Report
Construction of the Nairobi Expressway from JKIA to Rironi has significantly progressed at the South B area along Mombasa road.
Show more
Share This Video
facebook
google
twitter
linkedin
email
Video Link
Embed Video
<iframe width="600" height="350" src="https://dailytv.net//embed/x7yigei" frameborder="0" allowfullscreen></iframe>
Preview Player
Download
Report form
Reason
Your Email address
Submit
RELATED VIDEOS
01:52
President Commissions JKIA to Westlands Expressway
01:10
Construction of Nairobi Expressway progressing
01:40
CS Macharia: Nairobi Expressway 75% complete, old roads to be reopened by Christmas
03:43
Korang river to Haveli marquee concrete road Construction completed | FWO | Islamabad Expressway Construction update | DHA bridge progress
05:24
Plots in Sultanpur road Chand sarai ISBT | Plots near Lucknow Ballia expressway | Plots near Lucknow Buxar expressway | Plots near Lucknow ghazipur purvanchal expressway | Plots near Lucknow ambedkar nagar purvanchal expressway | Purvanchal expressway
04:04
Mbunge Wa Westlands Tim Wanyonyi Azindua Azima Ya Ugavana Nairobi
01:02
Kenya Airport Fire (Raw Footage) : Massive Fire Engulfs Nairobi JKIA Airport
00:04
@ Gypsy Westlands Nairobi
01:09
Floods cut off roads in Westlands, Nairobi
03:45
'Road to Prosperity' episode 12: Mombasa-Nairobi SGR: Local Capacity
03:45
'Road to Prosperity' episode 8: Protecting nature along the Mombasa-Nairobi Short Guage Railway
03:45
‘Road to Prosperity’ episode 11: Mombasa-Nairobi SGR: The Change of Voi