Let’s answer pre engineered steel buildings. Esthete prefab, with its decades of design & build experience, has been the forerunner in prefab technology. We use galvanised Light Gauge Steel (LGS) frames fabricated through computer-aided manufacturing technology at a factory. These frames are assembled on site to complete your building within 12 weeks, with all the embellishments. So, do you want a pre engineered steel building?