SPEED TRIAL Bangalore - Mysore Doubling : Indian Railways EXCLUSIVE

Kevug 2018-01-15

Views 5

Catch the Exclusive video of the Speed Trial Runs conducted by the COMMISSIONER OF RAILWAY SAFETY on the newly constructed Double Broad Gauge line over Simhsha River Bridge and also the Double line ready for traffic between Maddur and Settihalli Station on the Bangalore Mysore Main lines.\r
\r
\r
The Bridge is constructed by GVR Infra Projects Limited, the flagship Company of GVR Group, is one of the fastest growing infrastructure enterprises of India .\r
Events as seen in the video :\r
\r
Time Stamps\r
\r
0:16 TRIAL-1 SLOW SPEED\r
1:22 TRAIL-2 MEDIUM SPEED\r
2:47 TRIAL-3 MEDIUM SPEED\r
3:14 TRIAL-4 HIGH SPEED\r
\r
4:22 17307 -MYSORE - BAGALKOT BASAVA EXPRESS ON SHIMSHA RIVER - FOR EMD FANS\r
\r
5:52 56230 -MYSORE - BANGALORE PASSENGER ON SHIMSHA RIVER - FOR ALCo FANS\r
\r
7:33 OLD & NEW BRIDGE\r
\r
8:05 MOTOR TROLLEY\r
\r
Locomotives : KJM WDM3A 14053 & 17995.\r
Location : Settihalli and Maddur Stations of Bangalore Division of South Western Railway.\r
\r
Date : Monday, the 23rd June, new between 15-00 hrs. and 18-00 hrs.\r
\r
Now only a small stretch of Doubling is left out on the Mysore -Bangalore line, thats between Pandavpura-Srirangapatnam and Nagainhalli.

Share This Video


Download

  
Report form