Upper Bow Lift of Gerald R. Ford (CVN 78)

Billieujones3443 2016-03-05

Views 16

The length of the flight deck of the nuclear-powered aircraft carrier Gerald R. Ford is complete following the addition of the ships upper bow section on April 9 at .

See five superlifts in six minutes, illustrating the construction of the next-generation aircraft carrier Gerald R. Ford (CVN 78), built by Newport News Shipbuilding.
The flight deck of the nuclear-powered aircraft carrier Gerald R. Ford (CVN 78) was completed April 9 following the addition of the ships upper bow section at .

Share This Video


Download

  
Report form