The Post tours the inside of tunnel boring machine

The Washington Post 2015-10-26

Views 42

District of Columbia Water and Sewer Authority is building a 2,700-foot tunnel in Northwest Washington with the hopes of reducing neighborhood flooding. The Post tours the massive tunnel boring machine, named Lucy, as it moves about 50 feet a day underneath First Street NW.

Share This Video


Download

  
Report form