In this project a customer had a crack in the pipe which whilst wasn't cause blockages, led to a a floor cracking and the slab need to be raised, before this could happen, the pipe had to be relined to ensure the injections did not fill the pipe and cause it to become blocked.
https://www.piperescue.com.au